CASE STUDIES
Real installations, real savings — across pharma, auto, hospitality and process industries.
Hospitality
Taj Srinagar Transitions to High-Efficiency Heating & Cooling System
₹95+ lakh annual savings with ~1.6 year payback
8 heat pumps
- Installed — 818 kW winter / 490 kW summer, 514 kW cooling capacity
~1.6 years
- Payback, on ₹95+ lakh annual savings
- Taj Srinagar — replaced diesel boilers, electric heaters & a 150 TR chiller
- Now runs one integrated heat pump system on electricity instead of diesel (1.44 lakh L/yr)
- Energy cost cut from INR 1.70 crore/yr to INR 0.75 crore/yr; heating & cooling combined, emissions cut sharply
Hospitality
Taj Vivanta Achieves Significant Reduction in Heating Cost
~60% reduction in energy consumption with stable year-round performance
INR 2.8 lakh
- Saved in 3 months — ~480 units/day saved (winter), ~60% lower energy use
Stable performance
- Across seasons — seamless integration, reduced reliance on electric heaters
- Taj Vivanta, Katra — centralized hot water, ~100 kW load, ~50–60°C
- Underperforming 2×50 kW heat pumps + electric heaters replaced with a Heatray Air Source Heat Pump
- Capacity raised to 102 kW (winter) / 137 kW (summer); power input cut to ~34 kW
- Energy use down to ~320 units/day (from 800); efficiency up to COP ~2.5
Residential Buildings
Louisandra by Suraj Estate Reduces Hot Water Energy Cost with Single Centralized System
24x7 Hot Water Supply for 68 Apartments
Through One Centralized System
10,200 Litres / Day Hot Water Demand | Reliable 24x7 Supply with Lower Electricity Consumption
₹15–20 lakh
- Annual savings — cost reduction ~55–60%, payback ~1–1.5 years
~60% lower
- Electricity use — ~12–15 lakh kg/yr CO₂ savings
- Client: Suraj Estate – Louisandra, Dadar
- Application: Centralized Domestic Hot Water System
- Apartments: 68 Residences
- Hot Water Demand: 10,200 Litres / Day
- Objective: Reliable 24x7 hot water with lower electricity consumption
- Solution: 2 × Air Source Heat Pumps | 85 kW Capacity per Heat Pump | 5 KL Insulated Storage Tank | PLC Based Automated Control System | Continuous Circulation Loop | Centralized Hot Water Distribution Network
- Designed for Modern Residential Developments: One centralized hot water system replacing dozens of individual electric water heaters, delivering lower operating costs, simplified maintenance, and enhanced resident comfort.
Automotive
Eicher Achieves ~45% Reduction in Water Heating Cost
₹85+ lakh annual savings with <1 year payback
₹85+ lakh
- Annual savings — daily savings INR 28,862, cost reduction ~45%, payback <1 year
CO₂ ~2.1 kg/SCM
- Reduced fossil fuel dependence, ~7.0 lakh kg/yr CO₂ savings, cleaner operations
- Eicher Motors — pre-treatment hot water, 500 kW thermal load, 50°C→55°C
- PNG hot water generator replaced with Heatray Heat Pump; cost/day cut from INR 63,512 to INR 34,650
- Efficiency up to COP ~3; PNG gas swapped for electricity, emissions down
Automobile
VE Commercial Vehicles - Air-to-Water Heat Pump
Robo Washing Application 65°C Process Heating
35 kW
- Heat Pump Capacity
11.6 kW
- Electrical input/unit
1.49 yrs
- Payback -heating benefit
- Client: VE Commercial Vehicles Limited,Pithampur
- Application: Robo Washing
- Washing Tanks: 2 - Clean & Super Clean
- Tank Capacity: 1,600 L + 2.000 L
- Required Temperature: 65°C
- Operation Time: 24 hours/day
- Annual operating days: 303 days/year
- Existing Heating: Electrical heaters-8 kW x 6 per tank
- Total Rated Heater Capacity: 96kW
- Daily Electrical Consumption:1,025 kWh/day
- Annual Electrical Consumption:3,10,000 kWh/year
- Electricity Price:₹8/kWh
- Heat Pump Offered:2 x 35 kW Air Source Heat Pumps
- Control:SELEC PLC-based controller
Solution
- 2 x 35 kW air-source heat pumps integrated with the existing heating system, with 24×7 operation capability and estimated 3x efficiency versus conventional electrical heating.
Automobile
SATYAM AUTO COMPONENTS LTD., Ludhiana - Water-to-Water Heat Pump
8O°C Hot Water Supply | Replace PNG with Electricity
76 kW (Total)
- Heat Pump capacity
13.52 kW (Total)
- Electrical input required
~1.0 year
- Payback- heating benefit
- Client:Satyam Auto Components Ltd., Ludhiana
- Application: Process Heating Prewashing Tanks (Indirect Heating)
- Daily PNG consumption:170 scm/day
- Running hours: 24 Hrs/day
- Target supply temperature: 80 °C
- Cooling water (CT) in/out:27 °C/32 °C
- Current fuel: PNG
- PNG price: 62/scm
- PNG calorific value: 9500 kcal/scm
- Electricity tariff: 7.3/unit
- Cooling tower: Available
- Existing System:PNG based HWG (Hot Water Generator)
- Hot water for:Prewashing Tanks - Degreasing/Phosphating/KOD
- Existing return water temperature:60 °C
- Heat pump system:2 x 38 kW Water Source Heat Pumps (Total 76 kW)
- Electrical input required:13.52 kW (Total)
- Hot water supply:60 °C to 80 °C
- Heat source:Cooling Tower Return Water (32 °C to 27 °C)
- Operating principle:Reverse Thermodynamic Carnot Cycle
- Daily PNG cost:-₹10,540/day
- Annual PNG cost:--38.98 lakh/year
- Estimated savings:-32.63 lakh/year
Solution
- 2 x 38 kW water source heat pumps integrated with the existing cooling tower and HWG system. Utilizes cooling tower return water (32 °C) at evaporator side to cool it to 27 °C, and heats process water from 60 °C to 80 °C at condenser side. System provides 24 x 7 hot water supply with 3x efficiency compared to electrical heating, ensuring significant fuel cost savings and lower carbon emission.
Pharmaceuticals
Glenmark Achieves 61% Reduction in Heating Cost
₹50+ lakh annual savings with <1 year payback
₹50+ lakh
- Annual savings — daily savings ₹13,872, cost reduction ~61%, payback <1 year
CO₂ −2.68 kg/L
- Eliminated diesel usage, lower carbon footprint, reduced fossil fuel dependence
- Glenmark – Sikkim Plant — AHU heating, 10,000 L/day, 45°C→55°C
- LDO boiler replaced with Heatray Heat Pump; cost/day cut from ₹22,750 to ₹8,900
- Efficiency up to COP 3.5; diesel swapped for electricity, emissions down
Pharmaceuticals
Apothecon Achieves 56% Reduction in Heating Cost
₹55+ lakh annual savings with <1 year payback
₹55+ lakh
- Annual savings — daily savings INR 18,408, cost reduction ~56%, payback <1 year
CO₂ 2.68 kg/L
- Eliminated diesel/fuel dependency, lower carbon footprint, cleaner operations
- Apothecon — AHU heating, 50,000 L/day, 54°C→59°C
- Steam boiler replaced with Heatray Heat Pump; cost/day cut from INR 33,000 to INR 14,592
- Efficiency up to COP 2.3; diesel/LDO/PNG swapped for electricity, emissions down
Industrial Manufacturing
Siemens Reduces Heating Cost by ~40%
₹10+ lakh annual savings with <2 year payback
₹11+ lakh
- Annual savings — daily savings ₹1,350, cost reduction 30–40%, payback <2 years
CO₂ 0.82 kg/kWh
- Lower energy consumption, higher efficiency (COP>3), cleaner heating
- Siemens Ltd. – Kalwa Plant — kitchen process heating, 9,000 L/day, 30°C→70°C
- Electric heating replaced with Heatray Heat Pump; cost/day cut from INR 2,025 to INR 675
- Efficiency up to 300%+ (COP 3.5); emissions down
Chemicals
Rallis India Reduces Electric Heating Cost by ~60%
₹15–20 lakh annual savings with ~1–1.5 year payback
₹15–20 lakh
- Annual savings — cost reduction ~55–60%, payback ~1–1.5 years
~60% lower
- Electricity use — ~12–15 lakh kg/yr CO₂ savings
- Rallis India Ltd. (Dahej Unit) — reactor jacket heating, 65–100 kW, up to 70°C
- Electric coil heating replaced with Heatray Heat Pump; cost/day cut by ~60%
- Efficiency up from ~100% resistance heating to COP ~2.5–2.7; lower, more efficient grid use
Chemicals
SHAHAJANAND CHEMICALS, Ankleshwar - Air-to-Water Heat Pump
80°C Hot Water Supply | Replace NG with Electricity -
30 kW (Total)
- Hest Pump capacity
12 kW (Total)
- Electrical input required
~1.17 year
- Payback heating benefit
- Client:Shahjanand Chemicals, Ankleshwar ,Gujarat
- Application:Process Heating-Boiler Feed Pre-heating (Indirect Heating)
- Daily NG consumption(existing):-64.4 SCM/day
- Running hours: 24 Hrs/day (Heat Pump runs-20 Hrs/day)
- Target supply temperature:80°C
- Inlet water temperature:28 °C (Ambient soft water)
- Current fuel: Natural Gas (NG)
- NG price: ₹65/SCM
- NG calorific value:9,500 kCal/SCM (theoretical),8,075 kCal/SCM (practical)
- Electricity tariff: *7.5/unit
- Existing system:Direct ambient water feed to NG-fired
- Hot water for:Boiler Feed Pre-heating
- Existing inlet water temperature:28 °C
- Heat pump system:1 x 30 kW Air Source Heat Pump
- Electrical input required:12 kW (Total)
- Hot water supply:28 °C to 80 °C
- Heat source:Ambient Air
- Operating principle:Reverse Thermodynamic Carnot Cycle
- Daily NG cost (existing):~₹4,186 / day
- Annual NG cost (existing):~15.28 lakh / year
- Estimated savings:~₹8.66 lakh / yearr
Solution
- 1 x 30 kW air source heat pump integrated with the existing boiler feed line, replacing direct NG-based pre-heating.